Field installation in BC, Canada

About Project
Recent field deployments of Wi-Corr® Bond saw 8 sensors and transceivers fitted to a very remote Canadian upstream asset of a major national oil company. The asset was suffering from significant and unpredictable sand erosion.

Wi-Corr® Bond sensors were adhered to the metal pipe surfaces in sub-zero temperatures in a typically-difficult locations, where erosion/corrosion was known to occur.  Wi-Corr’s mesh network was interfaced with an on-site cellular modem to transmit all data back to Fort St John and Calgary.

Project Details
  • Categories:Wi-Corr® Bond
  • Number of sensors:8